Exterior afternoon shoreline view looking up at modular passive house / high performance Bella Bella Staff Housing, built with 12 prefabricated modules including solid-sawn heavy timber and oriented strand board (OSB)

Bella Bella Staff Housing

Location: Bella Bella, B.C.
Completion: 2015
Photo credit: Jaden Nyberg

Size
500 square metres

Modular Construction
Metric Modular, now Fort Modular

Owner
Vancouver Coastal Health

Structural Engineer
CanStruct Engineering Group

Project Materials
Lumber
Oriented strand board (OSB)
Plywood
Solid-sawn heavy timber

Structural Systems
Light frame
Low rise
Modular
Passive House / High performance
Prefabricated

Modular wood-frame construction for fast and energy efficient housing in a remote location

The health authority on British Columbia’s remote central coast turned to modular construction to quickly and efficiently build much-needed staff housing.

Off-site prefabricated construction kept project on time

The project was relatively small, but its challenges were big. The former Bella Bella hospital staff housing had been destroyed by fire. Vancouver Coastal Health faced a challenge: how to build an energy efficient replacement facility quickly and economically, in a community with a labour shortage, a hard-to-reach site and a challenging climate.

The speed afforded by modular wood-framed construction allowed Vancouver Coastal Health to construct new much-needed staff housing in the remote community of Bella Bella efficiently and cost-effectively.

Vancouver Coastal Health had also been wanting to change performance requirements for new facilities from LEED to Passive House, and the Bella Bella project gave them the opportunity to do so while lowering operating energy costs.

The modules were prefabricated at a site in Agassiz, to create a single building that consisted of six two-storey, two-bedroom townhouse units 125 kilometres away in Bella Bella. The walls and floors were constructed with standard spruce-pine-fir (SPF) dimension lumber, while structural plywood and oriented strand board (OSB) were used for the roof, wall sheathing and subfloor.

Each module was fitted out to the greatest extent possible. It took only 45 days to build the 12 modules, which were loaded onto trucks bound for the Fraser River. At the river, the modules were loaded onto a barge, and once at the site, lifted into place by crane.

While the modules were built at the factory, the foundation was laid on site. This simultaneous work saved about 30 per cent in construction time. Once the modules were set in place, the final envelope and weatherproofing was added, along with a rear post and beam deck out of exposed cedar.

Modular construction made Passive House standards possible

The project team built to a stringent Passive House standard to keep the facility’s operating costs down in extreme weather. Conventional on-site construction of such a highly efficient building in such a remote location would have been cost prohibitive. The efficiencies of off-site factory-built modules made a Passive House building possible. For example, the builders created mock-ups at the factory to test for thermal bridging, which is the occurrence of heat loss at junctions or gaps. It wouldn’t have been possible to do such testing on site. For the first time in Canada, a modular building was constructed to the ultra-low-energy Passive House standard, reducing the energy required for heating and cooling by approximately 90 per cent compared to conventional construction.