Join speakers from Weyerhaeuser, Simpson Strong-Tie, WoodWorks BC, FPInnovations and Weyerhaeuser Vancouver Parallam Plant on mid-rise wood design. This educational seminar is in reponse to recent code changes affecting 5- and 6-storey wood frame viability, and will provide engineers with key design and construction strategies. The seminar includes an optional Parallam PSL Plant tour from 2:00-3:00 PM (Max 30 participants for the tour).
Topics:
- Analysis of the most recent code developments and how they affect the lateral design of LWF mid-rise buildings.
- Updates on lateral systems and connections for wood shearwalls – larger take-up devices and rod systems.
- Discussion on how the materials under your shearwall can impact lateral connection and building movement.
Speakers:
- Steve McManus, P. Eng., Senior Engineering Manager – Canada, Weyerhaeuser.
- Timothy Wagner, P.Eng., Simpson Branch Engineer, Western Canada, Simpson Strong-Tie.
- Alejandro Coronado, P.Eng., Structural Engineer, WoodWorks BC.
- Dorian TungDaniel Zhang, Manager, FPInnovations.
- Plant Technical Director, Weyerhaeuser Vancouver Parallam Plant.
Date: Tuesday April 8, 2025
Time: 8:30 AM – 2:00 PM
Location: 1400 Lindsey Place, Delta, B.C.